top of page
Search

Markris Foods

  • Writer: Dave Westby
    Dave Westby
  • Jul 15
  • 1 min read

Tundra just completed works on a large dual temp room in Noosa.

  • 330m2 Dual temp room

  • 24*14m footprint @ 6m high

  • 150mm EPS-FR Panel

  • Concrete floor to allow 6T forklift traffic

  • Heated doors, heated floors

  • Automated doors


Check out the video below:


 
 
 

Recent Posts

See All
Clean Room Construction

Each cleanroom classification standard has a specific field of use. For example, the ISO 14644 standard (which has been adopted into the...

 
 
 

Comments


6/40 Junction Dr,
Coolum Beach 4573

QBCC# 15228840

0498398004

©2019 by Tundra Coldrooms. Proudly created with Wix.com

bottom of page